Sec. 2107 — Extension of authority to carry out certain fiscal year 2023 projects
TL;DR
Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117—263; 136 Stat.
Statutory text
(a) Extension. Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117—263; 136 Stat. 2970), the authorizations set forth in the table in subsection (b), as provided in section 2101 of that Act (136 Stat. 2971), and extended by section 2106 of the Military Construction Authorization Act for Fiscal Year 2026 (division B of Public Law 119—60; 139 Stat. 1267), shall remain in effect until October 1, 2027, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2028, whichever is later.
(b) Table. The table referred to in subsection (a) is as follows:Army: Extension of 2023 Project AuthorizationsState/CountryInstallation or LocationProjectOriginal Authorized AmountGermanyEast Camp GrafenwoehrEDI: Battalion Trng Cplx2 (OPS/Veh Maint)$64,000,000HawaiiFort ShafterWater System Upgrade$33,000,000Tripler Army Medical CenterUpgrade Potable Water System$38,000,000JapanKadena Air Force BaseVehicle Maintenance Shop$80,000,000
Extension of authority to carry out certain fiscal year 2023 projects (Table 2107)
| State/Country | Installation or Location | Project | Original Authorized Amount |
|---|---|---|---|
| Germany | East Camp Grafenwoehr | EDI: Battalion Trng Cplx2 (OPS/Veh Maint) | $64,000,000 |
| Hawaii | Fort Shafter | Water System Upgrade | $33,000,000 |
| Tripler Army Medical Center | Upgrade Potable Water System | $38,000,000 | |
| Japan | Kadena Air Force Base | Vehicle Maintenance Shop | $80,000,000 |
Source pages · congress.gov